How to scientifically and reasonably plan the site of an asphalt mixing plant?

Апр 18, 2025

The factors that affect the site selection of an асфальтосмесительный завод are very complex. Reasonable site selection and planning layout can lay a good foundation for later transformation, overhaul and maintenance, avoid additional expenses due to planning problems, and are an important guarantee for normal production in the future.

Target scale and supporting facilities

1. The planned annual output directly affects the equipment selection, the size and layout of the material yard.

2. Whether to add commercial mixing stations, water stabilization stations, sand making equipment and screening equipment now or in the future.

3. Whether to consider the intelligent design of asphalt mixing plant operation and maintenance to achieve network interconnection.

Functional area division of asphalt mixing plant

1. Production area, that is, the production area of оборудование для асфальтосмесительного завода.

2. Office area, office building for asphalt mixing plant staff, etc.

3. Living area, canteen and dormitory for employees, etc.

4. Construction machinery parking area, parking area for front-field pavers, rollers and other equipment.

asphalt mixing plant production area segmentation

1. Material yard, sand and gravel storage area, including recycled material storage area and crushing and screening area. The size of the material yard is planned according to the production capacity of the equipment.

2. Mixing operation area, that is, the location of the asphalt mixing plant, is used to produce asphalt mixture.

3. Transport vehicle waiting area, temporary parking area for vehicles transporting finished materials.

4. Natural gas supply area. If the gas station is built by yourself, the site layout must be fully considered.

5. Power supply area, the area where the transformer is located, the closer to the main equipment, the better, and safety factors should be considered at the same time.

Material yard planning

1. Consider the size of the material yard based on annual output, transportation distance of raw materials, supply and other factors.

2. General stone storage meets the raw materials required for normal production for seven days or more.

3. According to the size of the entire site and environmental protection requirements, determine the selection of concrete wall partitions, ground warehouses, steel plate warehouses, etc. to meet the later operation.

4. Fully consider the storage and processing of recycled materials to achieve a reasonable layout.

5. According to the current mix ratio of graded ingredients, determine the number of virgin material silos and recycled material silos.

6. The location of the plant shed needs to be planned in advance.

Mixing operation area planning

1. Layout is made according to the configuration of the selected asphalt mixing plant, the shape of the plant area, and the power supply and gas supply locations.

2. The route of the finished material transport vehicle in the plant area is smooth, with no large-angle turning dead corners as much as possible, and the transportation distance is minimized.

3. Minimize the impact on the office area and living area.

4. Consider the route and parking and unloading area for the supply material transport vehicle to enter the plant to unload materials, and try to avoid conflicts with other areas.

Equipment and material location reservation

1. Recycling equipment location reservation. If there is no recycling equipment, it is necessary to reserve the location for later equipment addition.

2. The asphalt storage and supply system area needs to consider reserving the location for adding asphalt tanks or asphalt depots in the future, and also consider reserving the location for the future addition of emulsified asphalt equipment, modified asphalt and colored asphalt.

3. Reserve the location of additive storage and supply equipment.

4. The above reserved locations need to consider route planning such as transportation and parking.

Peripheral supporting facilities

1. Firefighting facilities, including firefighting equipment, fire passages, etc.

2. The weighing area is generally located at the factory gate to facilitate the weighing of vehicles entering and leaving. It is best to leave two roads, one for weighing and one for daily entry and exit.

3. Since the vehicles entering the mixing plant are generally large vehicles, the width of the lanes in the plant is generally greater than 6 meters, and the curves are appropriately widened.

4. Reasonably configure greening to enhance the image of the mixing plant.

If you have any questions about asphalt mixing plant planning or are looking for a supplier of асфальтосмесительные установки для продажи, please contact us!